Quick search
Go!

COST ESTIMATING IN THE SHIP DESIGN


CRISTEA ANIƞOARA-GABRIELA
UNIVERSITY “LOW DANUBE” GALAƱI, NAVAL ARCHITECT FACULTY

Issue:

MOCM, Number 14, Volume II

Section:

Issue No. 14 - Volume II (2008)

Abstract:

Shipyards, whether doing ship repair or new construction, typically have to deal with a highly variable product or service to perform. This high degree of variation means that bidding on contracts can be extremely difficult, especially in a very competitive market. With minimal profit margins and precious little time available to make bids, the pricing of new work can be hazardous unless there is a quick and accurate means for developing reasonable and reliable cost estimates.

Keywords:

block, cost estimate relationship, ship work breakdown structure, product oriented work breakdown structure, life cycle costs.

Code [ID]:

MOCM200814V02S01A0008 [0002002]

DOI:


Copyright (c) 1995-2007 University of Bacău