Abstract
This paper presents an efficient lining method which confrontates the most common met problems in the manufacture management of several machineries and structures. Effective solutions are presented in order to develop quick and accurate lining methods for the diagnosis and quality assurance of the manufactures in their life cycle. In the end, useful case studies are presented and conclusions are made for the lining, construction, diagnosis and maintenance of machineries and infrastructure works.
Cuvinte cheie
manufactures’ diagnosis
sustainable development
manufactures’ quality assurance
lining methods
infrastructure works
spatial analysis
environmental impact assessment.