COST ESTIMATING IN THE SHIP DESIGN

  • CRISTEA ANIŞOARA-GABRIELA
    UNIVERSITY “LOW DANUBE” GALAŢI, NAVAL ARCHITECT FACULTY

Abstract

Shipyards, whether doing ship repair or new construction, typically have to deal with a highly variable product or service to perform. This high degree of variation means that bidding on contracts can be extremely difficult, especially in a very competitive market. With minimal profit margins and precious little time available to make bids, the pricing of new work can be hazardous unless there is a quick and accurate means for developing reasonable and reliable cost estimates.

Cuvinte cheie

block cost estimate relationship ship work breakdown structure product oriented work breakdown structure life cycle costs.